Cementaid (UK) Limited Home Page

Product Project References

Huizhou Bay Bridge

Huizhou Bay Bridge


Huizhou Bay Bridge

Completion Date: May 1, 2013
View as PDF view pdf
Architect: MLA Architects (HK) Ltd.
Contractor: CCCC Second Harbor Consultants Co.,Ltd
Structural engineer: Nil
Products Used: Everdure Caltite
Address: Hui Zhou, GuangDong, , China
Type: Bridges
Where Used: Corrosion-Protection
Documents




  
  1. Build across the Huidong Xunliao Bay and Nim flat Peninsula at Huizhou, Guangdong, China 2. Location Used: Cap (footing) and Pier (column) 3. Features Provides corrosion-proof to cap (footing) and pier (column) concrete, simple and fast construction, low maintenance and construction cost, enhance durability of the bridge concrete structure.




Created at: 27/12/2012



» back to previous page «
Project Home