Cementaid (UK) Limited Home Page

Product Project References

Nansha Phoenix III Bridge

Nansha Phoenix III Bridge


Nansha Phoenix III Bridge

Completion Date: Apr 5, 2012
View as PDF view pdf
Architect: Guangdong Highway Design Institute Co.,Ltd
Contractor: CHINA MAJOR BRIDGE ENGINEERING CO., LTD
Structural engineer: Nil
Products Used: Everdure Caltite
Address: NanSha GuangZhou, Guangzhou, , China
Type: Bridges
Where Used: Corrosion-Protection
Documents




  
  1. Build across the Hengli waterway (Connecting the Jiaomen waterway, Mountain Peninsula, The upper Hengli waterway, Hengli Peninsula and Under Hengli waterways, At the end of the Pearl River Management district.)at Nansha Guangzhou, Guangdong, China 2. Location Used: Cap (footing) and Pier (column) 3. Features Provides corrosion-proof to cap (footing) and pier (column) concrete, simple and fast construction, low maintenance and construction cost, enhance durability of the bridge concrete structure.




Created at: 27/12/2012



» back to previous page «
Project Home