Cementaid (UK) Limited Home Page

Product Project References

Nansha Phoenix I Bridge

Nansha Phoenix I Bridge


Nansha Phoenix I Bridge

Completion Date: Dec 30, 2011
View as PDF view pdf
Architect: Guangdong Highway Design Institute Co.,Ltd
Contractor: CCCC Second Harbor Consultants Co.,Ltd
Structural engineer: Nil
Products Used: Everdure Caltite
Address: NanSha Guangzhou, Guangzhou, , China
Type: Bridges
Where Used: Corrosion-Protection
Documents




  
  1. Build across the Jiao men waterway :Connecting the Jiaomen waterway, Mountain Peninsula, The upper Hengli waterway, Hengli Peninsula and Under Hengli waterways, At the end of the Pearl River Management district.at Nansha Guangzhou, Guangdong, China 2. Location Used: Cap (footing) and Pier (column) 3. Features Provides corrosion-proof to cap (footing) and pier (column) concrete, simple and fast construction, low maintenance and construction cost, enhance durability of the bridge concrete structure.




Created at: 27/12/2012



» back to previous page «
Project Home